
KEMPER 'Frosti®-plus' - the assembly kit Figure 574
The assembly kit for prefab installation facilitates installing valves already during shell work. The drainage housing is mounted after the exterior wall is complete.

![]() |
![]() |
![]() |
|
with operating handle |
with detachable key element |
optionally with lockable operating handle |
Benefits at a glance
- Only one overall length for all common installation depths (for wall thicknesses
up to 415 mm with surface mounting) - Stepless adjustment to the exterior wall thicknesses (from 150 - 655 mm)
- Always factory equipped with the mandatory, stipulated protection unit combination (loss free anti-vacuum valve and anti-pollution check-valve) in accordance with DIN/DVGW
- Integrated loss protected anti-vacuum valve
- DVGW tested and approved without any restrictions, noise-control tested in accordance with DIN EN ISO 3822
- Can be completely opened or closed with only 2 turns
- Uses completely automatic drainage after each stop process so no stagnation arises in the valve, i.e. no germ growth
- Valve with above-average drainage power of over 40 l per minute (at 1 bar), so pressure still applied with long water hose
- Already certified according to the new VP 648 DVGW test standard
- Quick and simple assembly
KEMPER 'Frosti®' - the original
Drinking water quality secured year around




